Design and custom installation of an in ground pool.
I am asked this question time and time again and there is no real answer.
The size of the project, the expertise needed for each step within the project, and of course
the weather all play a role in the timeframe to complete your new pool.
Most professional pool builders will have a starting package which includes the basics needed
with a list of options that can fulfill your needs.
On small to midsize residential backyards most timelines would be aprox. 2 weeks for
installation then allow time for sodding or landscaping to green things up.
Larger projects can include designs from landscape architects with great detail on elevations
drainage, deck space, gazebos, pool cabanas, fencing and retaining walls. This really helps
the homeowner see how the finished product will look in there back yard. These projects are
usually 4 - 8 weeks depending on product availability and good old mother nature.
Take the time to find a reputable builder that has experience and lots of pictures and referrals
to help guide and educate you on this process. The lowest price might make you feel good off
the start but the price is soon forgotten when things dont go as you planned. Remember life
is not perfect and when things go wrong you want a contractor that will recognize the issues
and make it right.