Our Blog

How long does it take to build an inground pool?

Posted by Phil Rintoul on Mon, Jun 10, 2013 @ 04:00 PM

Design and custom installation of an in ground pool.

describe the image

I am asked this question time and time again and there is no real answer.

The size of the project, the expertise needed for each step within the project, and of course

the weather all play a role in the  timeframe to complete your new pool.

Most professional pool builders will have a starting package which includes the basics needed

with a list of options that can fulfill your needs.

On small to midsize residential backyards most timelines would be aprox. 2 weeks for

installation then allow time for sodding or landscaping to green things up.

Larger projects can include designs from landscape architects with great detail on elevations

drainage, deck space, gazebos, pool cabanas, fencing and retaining walls.  This really helps 

the homeowner see how the finished product will look in there back yard.  These projects are 

usually 4 - 8 weeks depending on product availability and good old mother nature.

Take the time to find a reputable builder that has experience and lots of pictures and referrals

to help guide and educate you on this process.  The lowest price might make you feel good off

the start but the price is soon forgotten when things dont go as you planned.  Remember life 

is not perfect and when things go wrong you want a contractor that will recognize the issues 

 and make it right.

describe the image   Free Quote

 

Tags: BACKYARD ENTERTAINING WITH FLARE, How to get the best value, Insulation, Putting Modern Technology To Work For You, professional pool builders, Create a little paradise in your own backyard, Backyard Automation, Comfort and Design, Ease of Maintainance, ENTERTAINING, Reputation, The size of the project, design and custom installation